Яндекс рейтинг 5 звёзд
  • Free measurement
  • Fix price
Mechanized wall painting

Mechanized painting

Graco MARK VII painting equipmentWall painting is the most important stage of repair, on which the final appearance of the room depends. If a small area can still be painted by hand, then large premises will require a large amount of resources – both raw materials and human. For walls and ceilings on an industrial scale, mechanized painting is best suited, which will significantly reduce the duration of work.

The process of mechanized painting is quite simple: paint is poured into the device, which is supplied under high pressure through a hose to the nozzle. At the outlet, the pressure in the device drops, and the paint does not fly out in a jet, but in a cloud. This cloud is evenly distributed over the surface, lies in an even layer, without forming streaks. In addition to the fact that the painting process itself will take place much faster, the paint consumption itself will decrease by about four times.

In small rooms, the paint can be "sprayed" and get on surfaces that do not require painting. However, on an industrial scale, the method of mechanized painting is necessary in order to reduce the time of painting work.

Price list:

Want to reduce
the cost of your artwork?
Pay the full amount of the contract and get an additional 5% discount.
Would you like to pay for a job
upon completion?*
We can build everything with our own money, but it will cost you an additional 10%.
*Only with an agreement with the owner of the premises.
  • I have my own house, I'm building gradually, I decided to do as many hired a team through friends to plaster the walls, bought the material and it started. (I paid this crew for unloading, then for lifting, bought a bunch of everything for living. The guys worked for a couple of days, they didn't really like the quality (the hard workers said that everything would be fine in the end), but I didn't trust them, called a friend who was fumbling in the construction site, set a rule and realized that the quality was sad. The hard workers said that they always do this and this is normal. Kicked out, flew in almost 40 thousand. I started calling companies, agreed, 3 weeks have passed, then the team is busy, then something else. As a result, I studied the market well, climbed on the Internet. I called APR Construction, talked to Ilya. The next day in the morning there was a material, an engineer, a team. After 5 days, the house is ready, Checked, the level of work, really TOP.

  • "We would like to thank the company for ATR construction for the work carried out and the high-quality completion of the project. The project had a very tight schedule, but the company coped and the work was completed on time. Thank you, we recommend it!!!"

  • "We would like to thank the company for our renovated facility located in Moscow, and for the outstanding efforts made to complete the project quickly and efficiently. The project had a very tight schedule, but the company coped and the work was completed on time. Thank you, we recommend it!!!"

  • "We would like to thank the company for our renovated facility located in Moscow, and for the outstanding efforts made to complete the project quickly and efficiently. The project had a very tight schedule, but the company coped and the work was completed on time. Thank you, we recommend it!!!"


  • Central offices:
    Kholodilny lane, 3, bldg. 1, page 3, Moscow
    Odintsovo, Mozhaiskoe highway 122, office 74