Яндекс рейтинг 5 звёзд
  • Free measurement
  • Fix price
Building Partitions

Construction of partitions

The interior of a room can be significantly transformed due to the appearance of various kinds of partitions in it. Even the smallest decorative partition for a flower pot will bring comfort and aesthetics to your home. As for the volume partitions, it is safe to say that they have long been part of the design of a modern apartment. These are not only interior or inter-apartment partitions. To allocate a children's or a child's play corner, to define a recreation area for an elderly person, etc. - examples of the versatility of partitions. 

The whole complexity of the finishing work consists in the correct selection of materials and layout. But if you want to expand the room and make a studio or expand the bathrooms, some partitions will have to be removed. The same applies to industrial premises, offices, etc. Partitions of these rooms should be, first of all, sound-proof. These can be sliding, mobile structures.

Materials for the construction of partitions

Drywall

For the construction of partitions, the modern construction market offers a wide range of materials. The most common is drywall. This comes from:

  • easy to build
  • environmental friendliness
  • ease of processing
  • the possibility of constructing any structure
  • high installation speed
  • fire resistance

Such partitions can be built during the day, and the main advantage is the absence of "wet work", noise and dirt.

Plasterboard sheets are easily cut into any shape: arched, for niches, false walls, etc. There are dry and wet ways of bending this material.

Pazogrebnevye blocks

Pazogrebnevye are also universal materials for the construction of partitions. They are characterized by:

  • fast production
  • easy installation
  • flexibility in machining
  • eco-friendly safety

Partitions made of such material are neatly stacked blocks on the base. The blocks are simply attached to the surface with glue and set by level. After the first one dries, subsequent layers are applied and fixed with corners or glue.

Hollow or full-body slabs are used to control the load on the foundation. To improve sound insulation, you can make a partition of double blocks. But such operations will "steal" the area of the object.

Aerated concrete blocks

The blocks consist of cellular concrete, having a minimum mass, are characterized by a complex technology of manufacturing partitions, the presence of certain tools. However, the high-tech, practicality of this material is undeniable. It consists of:

  • low thermal conductivity
  • low specific gravity
  • non-flammability
  • resistance to fungi and mold
  • wide choice of sizes
  • economy in finishing
  • vapor permeability
  • environmental friendliness
  • high thermal insulation
  • frost resistance
  • low material cost

If you have no experience of such work, seek professional help from construction organizations. Aerated concrete partitions after the application of the master's hands will serve you reliably and for a long time.

Brick

Brick partitions are leaders in materials for the construction of partitions. These are:

  • reliability
  • durability
  • quality

Such partitions are traditional in nature and are recommended for redevelopment of loft-style premises. Brick perfectly tolerates the weight of any finishing materials and is most often used for the construction of load-bearing walls.

Our teams in cities
Moscow region
Our brigades in the Moscow region
  • Moscow
  • Podolsk
  • Odintsovo
  • Istra
  • Domodedovo
  • Chekhov

Price list:

Want to reduce
the cost of your artwork?
Pay the full amount of the contract and get an additional 5% discount.
Would you like to pay for a job
upon completion?*
We can build everything with our own money, but it will cost you an additional 10%.
*Only with an agreement with the owner of the premises.
  • I have my own house, I'm building gradually, I decided to do as many hired a team through friends to plaster the walls, bought the material and it started. (I paid this crew for unloading, then for lifting, bought a bunch of everything for living. The guys worked for a couple of days, they didn't really like the quality (the hard workers said that everything would be fine in the end), but I didn't trust them, called a friend who was fumbling in the construction site, set a rule and realized that the quality was sad. The hard workers said that they always do this and this is normal. Kicked out, flew in almost 40 thousand. I started calling companies, agreed, 3 weeks have passed, then the team is busy, then something else. As a result, I studied the market well, climbed on the Internet. I called APR Construction, talked to Ilya. The next day in the morning there was a material, an engineer, a team. After 5 days, the house is ready, Checked, the level of work, really TOP.

  • "We would like to thank the company for ATR construction for the work carried out and the high-quality completion of the project. The project had a very tight schedule, but the company coped and the work was completed on time. Thank you, we recommend it!!!"

  • "We would like to thank the company for our renovated facility located in Moscow, and for the outstanding efforts made to complete the project quickly and efficiently. The project had a very tight schedule, but the company coped and the work was completed on time. Thank you, we recommend it!!!"

  • "We would like to thank the company for our renovated facility located in Moscow, and for the outstanding efforts made to complete the project quickly and efficiently. The project had a very tight schedule, but the company coped and the work was completed on time. Thank you, we recommend it!!!"


  • Central offices:
    Kholodilny lane, 3, bldg. 1, page 3, Moscow
    Odintsovo, Mozhaiskoe highway 122, office 74